EPC of Biogas Engine Generators, Singapore
Project Details EPC of Biogas Engine Generators at JWRP (3MV) Contract nature: EPC + O&M Main Tech: GE Jenbacher Client: PUB Completion Date : Feb 2016 Project Details EPC of Biogas Engine Generators at CWRp (2MW) Contract Nature: EPC + O&M Main Tech : GE Jenbacher Client : PUB Completion Date : Jun 2016
-
Decommissioning & Recommissioning of Digester, Singapore
Project Details Client: PUB Scope of Work: Improve Digester Capacity in Jurong WRP: Design, Engineer, Procure and Install Chopper pumps. Mixing Tank System, Greasy Waste Heater and all related piping system to improve biogas yield from digester. Achieved 20% improvement in performance Time Period: – Contract Value: $873,000 + V.O. $86,000 % Completed: 100% Completion […]
-
Bio-gas Engine Installation, Singapore
Project Details Client: PUB Scope of Work: Jurong Water Reclamation Plant Phase 4 Expansion – Contract 2 (Solids): Supply and installation of Thermo Hydrolysis Sludge Treatment Plant, with Dewatering Centrifuge, Biogas Steam Boilers and Chemical Dosing Equipment Time Period: 18 months Contract Value: $16.6 m Completion Date: Oct 2016 Client: PUB Scope of Work: Supply […]
-
Energy Generator, Singapore
Design, Supply and Installation of 13 MW Engine Generator Plant using Biogas as fuel at Waste-To- Energy Plant; with Natural…